Friday 8 June
8.00am
Cement mixer and building materials arrive in loading bay
Lisa and Phil on site
10.00
Jess on site: to work on windows all day
11.00
Jill on site to set up for documentation (Jill - can you do enough
without Winand? or you can come later...?)
11.00/12.00
Bev on site. Bringing sound and lighting equipment to loading
bay
12.00 - 14.00
Put up lighting rig, fly cables. (Phil available to help)
Jean on site. Doran, Jean, Lisa meet re: FOH issues
15.00 OR 19.00
Aidan and Winand on site: set up bricks, put down polythene, construct
wet area
16.00
Colin on site. Set up sound equipment. fly sound cables
Kira and Sophia on site. Doran, Kira, Sophia meet. Check foam bases and plaster moulds.
NB: If Aidan and Winand can't get the day off and don't get to London
until 7pm then THIS WILL TURN INTO A LATE NIGHT. We'll know how this
looks v. soon and will let you know but be prepared anyway BE PREPARED
TO FINISH CIRCA: 22.00 if aidan and Winand are late getting in.
Saturday 9 June
(contingency plan is an earlier start if the space is not fully ready)
9.30
All on site:
(Kira, Jean, Lisa, Sophia, Tony, Phil, Aidan, Winand, Gill, Bev,
Jess, Colin)
10.00
Collect Doran from home. Security (Cat) on site
10.30
Begin wrapping doran
11.00 /11.15
Audience let in to space
11.30
Bricking in begins
NB: this is problem area ie. in reheasal this was quite slow so we need to work fast, and possibly be prepared to be late. lets not book in people to come and make their fingerprint until after 15.30 or even 16.00 to be sure...
14.00/14.30
Bricking in finished
re-set lights, clear windows
14.30 - 17.30
structure visible through windows
17.30 - 18.30
re-set sound and lights
18.30
audience let back into space
un-bricking begins
20.30
Performance ends
20.30 - 22.30
Break down structure and move out (OR SUNDAY)
Sunday 10 June
10.00
start clearing/cleaning/tidying
Lisa, Aidan, Winand
13.00
finish (hopefully)
Monday 11 June
08.00 -10.00
mixer etc. collected. Lisa and Phil on site